General setup of the project
TBD
This information only applies for conservation projects
Includes operating costs only
Includes capital and operation costs
Assumptions are applied across all projects, these can be left at default settings or can be specified to particular values.
Override specific cost inputs in this field. Otherwise, country specific assumptions will be considered.